Automatic Gabion Mesh Machine PLC Control For Slope Support CE Approved
Product Details
MLG
MLG-4300
CE
China
One set
4--5 sets per month
35 days after receiving deposit or L/C.
The main machine is mainly covered by thick plastic film; Packing and marking of the Goods should provide safety of the goods during its transportation to the place of destination. We will provide such packing of the goods which is customary required to